VB Arc360

United States · NFPA 70E

The arc flash program.

Not a study you repeat every five years.

Most plants treat arc flash as a five year event. NFPA 70E does not. It asks for a field work audit every year, a lockout and tagout audit every year, a programme audit every three, retraining every three, and the study reviewed at five. VB Arc360 runs that whole calendar as one engagement.

See the calendar
Stage 2 · Label Engineer in hi-vis and hard hat applying an arc flash warning label to a pump control panel, with adjacent panels already labelled
A label is the only part of a study a worker ever reads. Keeping every one of them current is what turns a study into a programme.
1,000+Power system studies
12Years · since 2014
21Countries
5Stages · one programme

The obligation

NFPA 70E does not ask for one thing every five years

It asks for four things on three different clocks, and every one of them has to be documented. Most vendors sell you the five year box. The other three are where compliance is actually lost.

Annually

Field work audit

Work practices audited to confirm the programme is followed in the field, not just written down.

Annually

Lockout and tagout audit

The energy control programme and its procedures, audited by a qualified person.

3 years

Programme audit + retraining

The electrical safety programme audited against the standard, and qualified persons retrained.

5 years

Incident energy review

The analysis reviewed for accuracy. A ceiling, not a schedule · any change resets it.

Why it slips

Compliance is not lost at year five. It is lost in year two.

Five years is a ceiling, not a schedule. The analysis has to be reviewed whenever a change alters the result. If your system changed in year two, your study was out of date in year two, and nobody sent a reminder.

The five year date is the one everybody diaries. The changes that actually invalidate a study happen quietly, are made by people who do not know they have moved a compliance obligation, and leave no trace on the label.

What triggers an early update

Each one changes the fault duty or the clearing time, and therefore changes the number on the label. A relay re-set on a Tuesday afternoon can invalidate a label that still looks perfectly current.

Had any of these on your plant since the last study? Tell us which and we will say whether it resets the clock.

And one detail that catches plants out. The five year clock runs from the completion date on the signed study, not from the day the labels went up. Installation often runs weeks or months behind report issue, so a plant that thinks it has eight months left may have three. Check the report date, then check the date on the label.

Not sure where you are in the cycle? Tell us the date on your existing labels.

The programme

Five stages, on one calendar

VB Arc360 is a single engagement that covers the whole obligation rather than the study alone. Each stage has its own recurrence, and the programme is what keeps them synchronised.

Stage 1

Assess

Photographic walkdown, client verified evidence, modelling and the incident energy analysis.

Stage 2

Label

Labels engineered, printed and installed at the equipment, with boundaries marked on the floor.

Stage 3

Train

Qualified person certification, immersive VR practice and a branded induction video.

Stage 4

Enforce

The annual field work audit obligation, discharged continuously rather than once a year.

Stage 5

Renew

Label currency, retraining cycles and the year five re-study, run from a verified baseline.

Stage 1 · Assess · the input layer is where studies fail

Most brownfield studies fail before a calculation runs. Single line diagrams drift, settings change, cable schedules vanish. Competitors disclaim the as-built data in an assumptions register and proceed anyway, which produces a number that is precise, wrong and believed.

Every nameplate, relay setting and cable schedule is photographed on site and uploaded for your engineers to approve before any model is built. Typical legacy discrepancy of 22 to 40 percent is reduced to under 2 percent before the model is touched. The audit trail is the deliverable.

Two engineers reviewing single line diagrams at a table in front of labelled motor control centre panels during a plant walkdown
Stage 1. The reconciliation, not the software. Drift logged per equipment item and co-signed by your engineer before any calculation begins.

Stage 4 · Enforce · the clause nobody automates

NFPA 70E requires the employer to audit field work at least annually, to confirm that the programme is actually followed at the panel. Most organisations discharge that with a once-a-year walkaround and a form.

VijAI PPEAI connects to the CCTV already installed in your electrical rooms and verifies arc rated PPE compliance continuously. It reads the rating on the worker’s garment against the incident energy on the panel, alerts the supervisor when they do not match, and logs every event.

That turns an annual sampling exercise into a continuous record. When an auditor asks how field work is verified, the answer is a log rather than a recollection.

Ask how the annual field work audit obligation would be evidenced at your site.

VB 40 cal per square centimetre category 4 arc flash suit with full hood and silvered face shield
The rating on the garment is the number that has to match the panel. Prescribing it is half the duty.
Four engineers in coveralls inspecting a switchgear lineup in a plant corridor
Verifying it is worn completes the duty, and it is the part the annual audit obligation is written about.

The VB Arc360 brochure

Seven pages you can forward. The five stages, the four written guarantees, what is included rather than quoted as an extra, the VijAI enforcement layer, and the standards an auditor checks against.

PDF · 7 pages · sent to your inbox after a four-field form

Multi-site

Who owns arc flash compliance across several plants

Three models exist, and most operators discover which one they have only after an audit finds a gap.

ModelWhat it gives you, and what it costs
CentralisedOne standard, one vendor, buying power, and consistent labelling across every site. The risk is that site specific conditions get averaged away and urgent local needs wait for a corporate decision.
DecentralisedLocal teams move fast and know their own equipment. The risk is drift · different interpretations of the same standard, inconsistent labelling, and duplicated spend.
HybridCorporate sets the standard and selects the vendor, sites execute against it. Most multi site operators end up here, and it is the model VB Arc360 is built to run.

Running several plants on different vendors and different dates? We will map them onto one calendar.

In writing

Four written guarantees on every engagement

A programme is a commitment over years, so the commitments are written into the engagement rather than described in a proposal.

01 · Turnaround SLA

Draft report within 15 business days of written approval of the single line diagram. The schedule lives on the project portal where you can see it, and any slippage caused by us is reported by us first.

02 · Free label re-issue

If your team corrects any input data within 30 days of the final report, we recalculate the affected buses and re-issue the labels at no cost. Accuracy is our risk, not yours.

03 · Audit support pledge

When a regulator, insurer or corporate auditor reviews the study, we stand with you. Documentation, methodology defence and engineer time are included, not quoted.

04 · 12-month warranty

Deliverables are warranted for 12 months. Any error or omission attributable to our engineering is corrected free of charge, with affected labels and tables re-issued.

The exposure

What an expired programme actually costs

1 · Incident

An arc fault injures a worker during routine switching.

2 · Investigation

The regulator, your insurer and counsel ask for the hazard assessment.

3 · No current record

Outdated labels, unverified data, lapsed training, no audit log.

4 · Liability

Citation, penalties, coverage disputes, personal exposure for the responsible manager.

The exposure is not the age of the paper. It is the absence of a current, documented assessment at the moment somebody asks for one. And insurers now ask at renewal, not only after an incident · thermographic inspection has moved from good practice to a condition of coverage in many programmes.

Insurance renewal coming up? We will tell you what your carrier is likely to ask for.

Infrared thermography, on the same visit

Arc flash and infrared thermography are increasingly tendered together, and for good reason: a hot joint is both a reliability problem and an arc flash initiator. We deliver both, which means one mobilisation, one outage window and one record rather than two vendors on different calendars.

Year by year

What the programme does, and when

YearWhat happens
Year 0Study, labels installed, boundaries marked, qualified persons certified, enforcement live.
Year 1Field work audit. Lockout and tagout audit. Data and label refresh against any changes.
Year 2Field work audit. Lockout and tagout audit. Change impact review on anything modified.
Year 3Programme audit against the standard. Qualified person retraining cycle. Both documented.
Year 4Field work audit. Lockout and tagout audit. Pre-review of the model ahead of year five.
Year 5Incident energy review. Re-study from a verified baseline rather than a fresh survey, because the data, labels and training records are already held.

The year five re-study is the reason the programme is cheaper than a series of one-off studies. It starts from a maintained record, not from a blank walkdown.

Due for a re-study? A renewal from a maintained baseline is a different scope to a first study.

Want the calendar mapped against your actual study date and label revisions?

Where the programme connects to the wider practice

Questions plants ask about the programme

How often must employers audit their electrical safety program?

NFPA 70E sets three separate audit intervals. The electrical safety program is audited against the standard at intervals no greater than three years. Field work is audited at least annually. The lockout and tagout program is audited at least annually by a qualified person. Every audit must be documented. VB Arc360 runs all three on one calendar.

When should an arc flash study be updated?

The incident energy analysis is reviewed for accuracy at intervals not exceeding five years, and sooner on any change that alters the result. Five years is a ceiling, not a schedule. If your system changed in year two, your study was out of date in year two. VB Arc360 tracks the triggers, not just the calendar.

When does the five year clock actually start?

From the completion date on the signed and stamped study, not from the day labels were installed. Plants routinely get this wrong by months, because installation often runs weeks or longer behind report issue. Check the date on the report, then check the date printed on the label. VB Arc360 records both.

What happens if our arc flash study has expired?

An expired study is a documented gap. Workers are performing energised work against labels built on stale data, which is difficult to defend in an incident investigation, at an insurance renewal or in front of an inspector. The exposure is the absence of a current assessment, not the age of the paper.

What is an arc flash program, and how is it different from a study?

A study is a project that ends when the report is signed. A program is the recurring obligation that follows it: labels kept current, qualified persons retrained, field work audited annually, the program itself audited every three years, and the study reviewed at five. VB Arc360 is that program, run as one engagement.

Do all arc flash labels have to be replaced when the study is updated?

No. Where the recalculated incident energy is unchanged, the existing label remains valid. Every label should still be inspected for legibility, adhesion and conformity with the current labelling requirement. VB Arc360 re-issues only what changed and inspects the rest, which is why a renewal costs less than a first study.

What triggers an early arc flash study update?

Adding or replacing a transformer, a change in available utility fault current, new switchgear or motor control centres, significant load additions, altered protective relay or fuse settings, adding distributed generation or battery storage, and any major reconfiguration. Each one changes the fault duty or the clearing time, and therefore the label.

How do we track arc flash status across every asset?

Per equipment item, not per site. Each bus carries its own study date, incident energy, label revision, and the review date that follows from it. VB Arc360 holds that record so the next renewal starts from a verified baseline rather than a fresh survey, and so any panel can be checked in seconds.

Is infrared thermography required annually?

Thermographic inspection is treated as an annual activity in current maintenance practice, and many insurers now require it as a condition of coverage rather than as good practice. VB Engineering delivers infrared thermography alongside the arc flash program, which is how most tenders ask for it.

Who owns arc flash compliance across multiple sites?

Three models exist. Centralised gives one standard and buying power but can miss site nuance. Decentralised is fast locally but drifts between sites. Hybrid, with corporate setting the standard and sites executing, is what most multi site operators settle on. VB Arc360 is built to run either way.

Proof of delivery

The programme, on the plant floor

A programme that lives in a spreadsheet has not changed anything. Every stage ends in something physical at the equipment, and something documented in the record.

Engineer applying an engineered warning label to an outdoor transformer marshalling box
Stage 2 · LabelEvery assessed item labelled at the equipment, indoors and out. Re-issued only where the number changed.
Trainee wearing a virtual reality headset during an arc flash training session while the screen mirrors the switchgear scene
Stage 3 · TrainWorkers practise the response before they face the risk. Retraining is a three year obligation.
The VijAI edge compute device held on an open palm, showing how small the unit that runs continuous PPE verification is
Stage 4 · EnforceVijAI runs on this. One edge device on the CCTV you already own, turning an annual audit into a continuous log.

Selected clients · 1,000+ studies · 21 countries

Bayer Pfizer TATA Adani JSW Nestle Rolls-Royce DuPont Siemens Amazon Bosch Coca-Cola Hindalco Kia Mahindra ITC Bayer Pfizer TATA Adani JSW Nestle Rolls-Royce DuPont Siemens Amazon Bosch Coca-Cola Hindalco Kia Mahindra ITC

Put your plant on one calendar

Tell us the date on your last study, the date on your labels, and how many sites you are running. A Chartered Engineer comes back inside 24 hours with where you actually are in the cycle and what falls due next.

  • Four fields. No phone interview to start.
  • Works whether the original study was ours or not.
  • Single site or a corporate rollout across several plants.
  • Four written guarantees on every engagement.

Yellow and red arc flash boundary lines marked along matting in a switchgear aisle
The end state a programme maintains: boundaries marked, labels current, and a record that shows when each was last verified.

Is your arc flash study still current? Send us the date and we will tell you what falls due next.