VijAI PPEAI), Renew. NFPA 70E + CEA 2023."> VijAI PPEAI, multilingual labels. NFPA 70E + CEA 2023.">
VB Arc360 delivered on Indian sites, against the frame an Indian plant is actually audited on · CEA Safety Regulations 2023, IS 3043, the Factories Act duty of care, PESO and your State Electricity Inspectorate, with NFPA 70E and IEEE 1584 carried alongside for corporate HSE. Chartered Engineers (CEng MIE India) sign every report from Hyderabad HQ. See how the five-stage programme works →
Selected engagements across the VB Group portfolio · F500 operator base · 25 of 63 verifiedplus 20 more on our verified roster. ISO 45001 · ISO 9001 · Licensed ETAP · SKM · AutoCAD.
An arc flash is an uncontrolled release of electrical energy through air, and it waits inside ordinary panels for an ordinary task · a racking operation, a loose connection, a dropped tool. In India the consequence rarely stops at the injury. The Chief Inspector of Factories opens a file under the Factories Act, the State Electricity Inspectorate asks what hazard assessment existed for that bus, the insurer asks for the study and the training register, and where the site is PESO-licensed the licence conditions come into scope too. Every one of those questions is answered by the same document.
An arc fault injures a worker or contract operator during routine switching.
Factories Inspectorate, Electrical Inspectorate and your insurer ask for the hazard assessment.
Stale DISCOM fault level, outdated labels, no Qualified Person register for contract labour.
Occupier liability under the Factories Act, CEA non-compliance, disputed claims, prosecution risk.
Safety is not a report. It is a responsibility.
NFPA 70E does not stop at the study. It expects labelling, training, auditing and renewal to follow. VB Arc360 closes the loop · five engineered stages, 72 degrees each, that take your plant from assessed to permanently protected.
Onsite data capture, photographic evidence to the ElecTwin cloud, ETAP modelling, IEC 60909 short circuit, IEEE 1584 incident energy, NFPA 70E risk assessment.
NFPA 70E warning labels engineered, printed, pasted at site in English + Hindi + Arabic + Chinese. Arc flash boundaries painted on the floor.
TeXeT QP PortalNFPA 70E 110.6. VR immersive moduleheadset included. Arc Flash Safety 3D Animated Training Videobranded.
Audit support per NFPA 70E. VijAI PPEAIAI vision platform watches existing CCTV for arc-rated PPE compliance, alerts supervisors, logs audit events.
Annual label + data updates. Year three QP refresher. Year five mandated re-study per NFPA 70E and CEA 2023.
A typical Indian brownfield plant has been re-rated two or three times since commissioning, with feeders added under capex that never reached the drawing office. Add a DISCOM fault level letter that has not been refreshed since the last substation augmentation and the model is wrong before the first calculation runs. Our walkdown teams photograph every nameplate, every relay HMI setting and every cable schedule on site, and we write to the DISCOM for a current short-circuit contribution letter rather than assuming one. Your engineers approve the evidence pack in ElecTwin before ETAP is opened. See how the Assess stage works →
Onsite photo of every data point
Uploaded to ElecTwin
You verify the evidence
ETAP · IEC 60909 · IEEE 1584
On an Indian site the electrician at the MCC and the contract workforce at the incomer rarely share a first language. We issue every label bilingually · English plus Hindi, and on request the regional language of the plant, Telugu, Tamil, Marathi, Gujarati or Odia. Labels carry incident energy in cal/cm², the arc flash boundary in metres, the PPE category and the equipment ID, engineered to your bus and pasted at site by the VB team, with boundary marking painted on the floor the same visit. The format satisfies NFPA 70E 130.5(H) and reads correctly to a State Electricity Inspectorate officer.
Real label samples from VB Arc360 deployments.
The Factories Act and the CEA Safety Regulations both put a documented competence duty on the occupier, and an inspectorate visit asks for the register, not for a claim. VB Arc360 issues named digital certificates through the TeXeT portal, backed by Drona VR immersive simulation and a branded induction video, so competence is evidenced per person, per date, per shift · including the contract workforce, which is where most Indian sites are actually exposed.
NFPA 70E 110.6 aligned. Structured online assessments, automated pass and fail criteria, certificates with Safety Hero GOLD, SILVER, BRONZE, Participation tiers. Records that defend you in audits.
Perpetual licence including the VR headset device. Realistic arc flash hazard simulation, PPE selection drills, safe-work-practice scenarios. Risk-free, experiential, memorable. Workers practise the response before they face the risk.
A professionally produced 3D animated arc flash video · about three minutes · customised with your logo and site context. Plays at inductions, toolbox talks and contractor onboarding. Your standard, every single time.
Indian sites run large contract workforces on rotating shifts, and that is where arc-rated PPE discipline slips first. PPEAI is the AI vision platform from VB Group's VijAI suite. It connects to your existing CCTV and verifies arc-rated PPE compliance in real time, in the electrical rooms your study flagged. NFPA 70E requires the employer to audit field work and verify procedures are followed · PPEAI automates that duty.
CEA 2023 and NFPA 70E both anchor on a five-year re-study, but in India the clock is usually reset earlier by something else · a DISCOM substation augmentation that lifts your fault level, a captive generation or rooftop solar tie-in, a new feeder added during a shutdown, or a relay settings change after a trip investigation. We track those triggers against your asset register and refresh labels and training on the same cycle.
Study · labels · training launch
Annual data + label refresh
Annual data + label refresh
QP refresher cycle · portal renewal
Mandated re-study · CEA 2023 + NFPA 70E
Incident energy scales with the fault current the utility can deliver into your incomer. Most Indian studies quote a number from an old letter, or an assumed infinite bus, and carry the error into every label on site. We obtain a current letter from the DISCOM and model both the maximum and minimum contribution, because the minimum case usually produces the longer clearing time and the higher incident energy.
Every nameplate, every relay HMI setting, every cable schedule, every utility short-circuit letter · photographed at site and uploaded to the ElecTwin cloud verification platform. Your engineers approve the evidence before a single calculation runs. Typical 22 to 40 percent legacy SLD discrepancy reduced to under 2 percent · before ETAP touches your model. The audit trail is the deliverable.
Arc flash today. Load flow, short circuit, protection coordination tomorrow. TeXeT certification, VR training, VijAI PPEAI monitoring, and digital twin handover · all from one accountable engineering partner. No specialist or EPC matches this integrated stack.
Licensed ETAP, SKM, AutoCAD. Cost-efficient analytical depth delivered to NFPA 70E, IEEE 1584 and IEC 60909 international standards. The same quality international consultants deliver, at delivery economics they cannot match.
CEA Safety Regulations 2023 place a duty on the owner to keep apparatus safe and to ensure live work is carried out only by authorised persons under proper precautions. NFPA 70E 2027 + IEEE 1584 2018 + IEC 60909 are the universally accepted technical method. The Factories Act sets the duty of care. PESO, DGFASLI, CEA and the State Electricity Inspectorate audit compliance. Arc-rated PPE cannot be defensibly selected without an incident energy study.
Real VB engagements across 21+ countries · arc flash field work, photographed at site.
Four written commitments that make the compliance duties of this scope enforceable. Each one is part of every VB Arc360 engagement.
Draft report within 15 business days of written SLD approval. Schedule lives on the project portal where you see it, and slippage caused by us is reported by us, first.
If your team corrects any input data within 30 days of the final report, we recalculate affected buses and re-issue the labels at no cost. Accuracy is our risk, not yours.
When a regulator, insurer or corporate auditor reviews this study, we stand with you · documentation, methodology defence and engineer time, included.
Study deliverables are warranted for 12 months. Any error or omission attributable to our engineering is corrected free of charge, with affected labels and tables re-issued.
Tell us your plant, your study history, and your timeframe. A Chartered Engineer (CEng MIE India) at Hyderabad HQ responds within 24 hours · with an evidence-grade scope, the DISCOM data we will need from you, and reference Indian sites where the programme is already running.
India · CEA 2023 + NFPA 70E + IEEE 1584 context pre-filled · routes to PSS Practice Lead at Hyderabad HQ.
Live deployment · field photography